F3/AR-F3 foam selection
The risk of hydrocarbon fuel and alcohol and polar solvent fire are separated; The need for alcohol resistant AR-F3 is determined by the product's tested fuel compatibility and certifications.
Fluorine-free F3 and alcohol-resistant AR-F3 foam extinguishing, dosing system, foam room, monitor and sprinkler compatibility in flammable liquid facilities.
Current situation discovery, design scenario, equipment list, system layout, application details, material/luminaire selection and relevant calculation reports are prepared.
Depending on the type of project, quantity surveying, technical specifications, test procedure and as-built drawings are also included in the scope of work.
Instead of 'carbon-free foam' the technical term fluorine-free foam (F3/fluorine-free) should be used. F3 products are not directly interchangeable with AFFF; chemical/equipment compatibility and fire testing documentation required.
The current BYKHY, relevant product and system standards, manufacturer conformity certificates and authorized administration/fire department opinions are verified at the beginning of the design. Fixed flow/pressure/capacity values are not declared without project data.
Technical Project Request →In the F3 Foam Extinguishing study, the following information can be shared at the first meeting. Field detection or additional calculation requirements for missing data are determined separately. Preparation of documents does not automatically guarantee acceptance by the relevant institution or a particular test result.
| Startup entry | Output to be defined in the proposal |
|---|---|
| Protected material and special risk information | Project principles and agent/equipment compatibility control |
| Concrete product and compliance documentation of the agent | Dosage and installation layout |
| Current dosing, pump and piping information | Testing and environmental management conditions defined in the contract |
The district of the facility, its usage style and the requested service, as well as protected material and special risk information are shared. Account, project, application and test items are separated in the written scope.
The drawings are compared with the field. If there are revisions, changes in use, and missing equipment information, their impact on the account or project is examined.
Project principles and agent/equipment compatibility control, dosage and installation layout and other documents included in the scope of work are delivered. The file format and revision scope are determined at the outset.
No. Usage, system structure and field data are different. Numerical values cannot be applied to all facilities without verifying the relevant calculation and method.
Project planning, assembly, field inspection and testing tasks are defined separately. The proposal states which party is responsible for which work.
Requests from Çorlu, Ergene, Kapaklı and Tekirdağ are evaluated from our Çerkezköy center. The time and conditions of the field visit are decided separately.
Share the facility location, current project status and desired service for F3 Foam Extinguishing. Let's clarify the scope of discovery, calculation, application and delivery together.