0506 024 37 22info@mkamuhendislik.com
MKA Engineering · Project and technical consultancy

Corlu Mechanical Installation

MKA Engineering provides mechanical installation project, calculation, application coordination and technical consultancy services for facilities in Çorlu and its immediate surroundings. Heating, cooling, ventilation, plumbing and industrial auxiliary lines are evaluated together within the needs of the same facility. In requests coming from our Çerkezköy center, the current system of the business, the expected output and working constraints are first clarified. Establishing a new mechanical center and renewing a line in a building that is still under production do not require the same business plan. Therefore, the price and schedule are not based solely on area information; The scope is determined by examining the process, capacity, current project and field conditions.

quick reply

MKA Engineering provides mechanical installation project, calculation, application coordination and technical consultancy services for facilities in Çorlu and its immediate surroundings. Heating, cooling, ventilation, plumbing and industrial auxiliary lines are evaluated together within the needs of the same facility.

Accurate location description around Çorlu and Ergene

Industrial areas near Çorlu may be located within different districts and administrative borders. For example, the current contact address of Velimeşe OSB is stated as Ergene / Tekirdağ. This distinction helps to correctly determine the discovery address, relevant institution and delivery conditions. We do not create fake branch locations by using the names Çorlu, Ergene or Velimeşe interchangeably. It is sufficient to share the actual location of the facility and, if necessary, OIZ information in the request for proposal. The mention of OIZ names does not mean an official agreement or supplier status.

Determining the heating and cooling load before the equipment

The needs of the structure and process should be determined before choosing a boiler, heat pump or chiller. The use of spaces, working hours, equipment loads, external conditions and distribution system are considered together. Copying the label capacity of the old device exactly does not indicate the suitability of the new device. If there is a capacity increase or usage change, account entries are updated. Project; It is defined to include piping, terminal units, technical volume, maintenance access and control scenario. The necessary electrical and structural coordination is carried out by the relevant disciplines.

Ventilation and local suction in the production area

General volume ventilation and collecting dust or smoke at the source have different purposes. The source point, characteristics of the pollutant, working area, fresh air supply and discharge conditions are examined. Fan selection is not only based on catalog flow rate; The operating point is evaluated with channel and equipment losses. If there is a deficiency in the current system, usage and measurement data are collected first. If there are special process, flammable dust or hazardous environment requirements, these are covered by separate expertise and verification requirements; The general ventilation project is not presented as meeting every specific requirement.

Hydronic distribution, plumbing and pump groups

In heating and cooling circuits, pipe diameters, pressure losses, pump selection, balancing and control elements are interconnected. In plumbing, consumption points, network data, domestic water tank, booster and drainage are planned together. Whether the system is open or closed circuit affects the calculation approach. When changing equipment, the compliance of existing lines and control system with new working conditions is examined. If key assumptions and account entries are shown in the delivery file, the maintenance team can more easily track which conditions they need to maintain in subsequent changes.

Compressed air, steam and process auxiliary lines

In a facility around Çorlu, mechanical demand may not only be for comfort air conditioning. Separate operating inputs are required for compressor feed, compressed air distribution, steam-condensate or process water lines. Desired fluid properties, pressure, temperature, consumption scenario and existing equipment are shared by the employer. Pipe route, insulation, supports, drainage and maintenance access are evaluated with this information. Special equipment inspections or government control requirements are kept separate from the overall project service. Standard diameter or capacity is not declared without technical calculation.

Implementation and supervision in the operating facility

In an ongoing production facility, the work order, access, temporary connections and systems that will be disabled are discussed in advance. Which productions, visits and document reviews the inspection service covers are specified in the contract. Material change or route revision is recorded in the drawing. The acceptance criteria and the responsible party for testing, adjustment and commissioning work are clarified. The installation photo alone does not prove that the system operates correctly under all operating conditions. Measurement and delivery records are prepared according to the scope of work; The information to be presented to the business team is clearly described.

Creating comparable scope in the proposal

In the first request, write the company name, the district of the facility, the relevant mechanical system, the current project status and the expected service. Specifying whether you want project, implementation, supervision or current situation assessment makes it easier to compare offers. The approximate size of the work area is helpful to get started; It is not the only price input. Architectural drawings, device lists and operating expectations, if any, are examined. Delivery list, field visit, calculations, number of revisions and implementation works are separated in written scope. Confidential process information should only be communicated within the framework of your business' sharing rules.

Frequently asked questions

Do you have a branch in Çorlu?

Our headquarters is in Çerkezköy. Service requests for Çorlu are evaluated from this center; This page is not a separate branch or address statement.

Can exploration be done while production continues?

Plans can be made according to the security and access rules of the business. Situations where measurement or testing will affect the system are also evaluated.

Can I get project service only?

Yes. Project, calculation, implementation and control requests can be offered with separate scopes. The documents to be delivered are clarified at the beginning.

Are ventilation and cooling the same system?

Their purposes and account entries are different. They may need to work together; fresh air, pollutant control and thermal load are examined separately.

Is the current device capacity considered sufficient?

Label data is the initial input. Capacity adequacy cannot be stated without evaluating the actual usage, distribution and operating conditions.

What information is required for the price?

Share the service you want with facility location, system type, current project and device information. Missing data are identified during discovery or document review.

Discovery and technical proposal request

Share the facility location, current project status and the service you want for Çorlu Mechanical Installation. Let's clarify the scope of discovery, calculation, application and delivery together.

Region and official information sources

These links are sources of information; It is not a claim of agreement or official business partnership with institutions.