Risk and volume analysis
The net volume of the space, suspended ceiling, raised floor, equipment, user presence and electrical risks are determined separately.
Clean gas or inert gas extinguishing in electrical room, server room and sensitive areas, extinguishing agent calculation, nozzle and sealing.
In gas extinguishing project work, current dimensions of the space to be protected, door and vent positions, cylinder placement area, nozzle points, detection-control interfaces and discharge safety are converted into technical drawings and calculation inputs.
Depending on the type of project, quantity surveying, technical specifications, test procedure and as-built drawings are also included in the scope of work.
TS EN 15004, relevant agent conditions, user exposure and manufacturer acceptance procedures are taken as basis. This system is for fire extinguishing agents; It is not a fuel gas installation.
The current BYKHY, relevant product and system standards, manufacturer conformity certificates and authorized administration/fire department opinions are verified at the beginning of the design. Fixed flow/pressure/capacity values are not declared without project data.
Technical Project Request →In Gas Fire Extinguishing work, the following information can be shared at the first meeting. Field detection or additional calculation requirements for missing data are determined separately. Preparation of documents does not automatically guarantee acceptance by the relevant institution or a particular test result.
| Startup entry | Output to be defined in the proposal |
|---|---|
| Space usage, volume and opening information | Scope of agent and system selection |
| Current agent and equipment documentation | Mechanical placement and discipline coordination |
| Detection and security scenario inputs | List of documents required for testing and acceptance |
The facility's district, usage type and requested service, as well as location usage, volume and opening information are shared. Account, project, application and test items are separated in the written scope.
The ventilation scenario is re-examined with changes made to the room's doors, vents or cable passages. The effects of these changes on sealing, agent distribution, detection and safe discharge patterns are evaluated separately.
The scope of agent and system selection, mechanical layout and discipline coordination and other documents included in the scope of work are delivered. The file format and revision scope are determined at the outset.
No. Since the space volume, sealing, agent selection and human safety conditions are different in gas extinguishing, project-specific data of the space and system components are determined first.
Project planning, assembly, field inspection and testing tasks are defined separately. The proposal states which party is responsible for which work.
Requests from Çorlu, Ergene, Kapaklı and Tekirdağ are evaluated from our Çerkezköy center. The time and conditions of the field visit are decided separately.
Share the facility location, current project status and desired service for Gas Fire Extinguishing. Let's clarify the scope of discovery, calculation, application and delivery together.