Fire Cabinet and Fire Department Connection System Project

TS EN 671 fire hose cabinets, floor columns, fire brigade connection ports, valve arrangement and critical point pressure calculation inside the building.

Technical System Scope

Design, calculation and application details for Fire Cabinet and Fire Department Connection

In the indoor fire cabinet and fire department connection, the location of the cabinets in the floor plan, user access, vertical column arrangement, connection directions, valves and control points are examined together. The intervention order required by the use of the building is clarified with project inputs.

01 / SYSTEM

Hose and cabinet system

The need for use of semi-rigid hose reel fire cabinets (TS EN 671-1) and flat hose reels (TS EN 671-2) is evaluated according to user type and facility risk.

02 / SYSTEM

Floor plan and access

The positions of the cabinets, door openings, escape route, accessibility and the reach of the hose to the intervention area are checked on a floor-by-floor basis.

03 / SYSTEM

Horizontal distribution and column

Indoor fire columns, branch pipes, isolation valves, floor transitions, vertical lines and zoning details are designed.

04 / SYSTEM

Fire brigade connections

Fire brigade water supply and water intake connections are designed without mixing; Check valve, connection direction, cover, marking and safe access are examined.

05 / SYSTEM

Flow rate and pressure

Net outlet pressure is verified by level difference, simultaneous operation, armature losses and line friction at the most unfavorable cabinet or connection point.

06 / SYSTEM

Field tests

Hose-nozzle, cabinet door, valve opening and closing, test/discharge, manometer measurements and fire pump interaction are included in the acceptance plan.

Project Documents

Calculation, equipment and scope of delivery

In the fire cabinet and fire department connection work, floor-based cabinet layouts, hose access areas, column diagrams, fire department connection directions, valve and check valve equipment, and line data used in the calculation are arranged together.

  • Hose and cabinet system
  • Floor plan and access
  • Horizontal distribution and column
  • Fire brigade connections
  • Flow rate and pressure
  • Field tests

Depending on the type of project, quantity surveying, technical specifications, test procedure and as-built drawings are also included in the scope of work.

Standardization and Security

Technical conditions and important notices

Within the scope of TS EN 671 product standard and BYKHY, the necessity of the system, hydraulic flow rate and usage scenario should be checked separately. The fire cabinet does not replace the sprinkler system.

The current BYKHY, relevant product and system standards, manufacturer conformity certificates and authorized administration/fire department opinions are verified at the beginning of the design. Fixed flow/pressure/capacity values ​​are not declared without project data.

Technical Project Request →

Discovery inputs and engineering deliverables

In the Fire Cabinet and Fire Department Connection study, the following information can be shared at the first meeting. Field detection or additional calculation requirements for missing data are determined separately. Preparation of documents does not automatically guarantee acceptance by the relevant institution or a particular test result.

Scope table for Fire Cabinet and Fire Department Connection
Startup entryOutput to be defined in the proposal
Building plan, column and cabinet locationsCabinet and connection layout
Feeding, weight and usage informationColumn diagram and account entries
Fire department access conditionsLabel, access and test scope

Frequently asked questions

How to prepare a quote for Fire Cabinet and Fire Brigade Connection?

The building plan, column and cabinet locations are shared along with the facility's district, usage style and desired service. Account, project, application and test items are separated in the written scope.

How to control fire cabinet access when the floor plan changes?

In revisions to interior walls, escape routes or floor usage, access to cabinets, column connections and the accessibility of the fire department entry point are re-evaluated. The label and equipment locations in the field are compared with the project.

What documents are submitted?

Cabinet and connection layout, column diagram and calculation entries and other documents included in the scope of work are delivered. The file format and revision scope are determined at the outset.

Is the fire cabinet and column diagram the same in every building?

No. The placement of the fire cabinet and fire department connection is examined according to the building plan, connection layout, floor elevations and usage conditions. A single scheme for a cabinet or column cannot be transferred to every structure exactly.

Are implementation and control the same scope?

Project planning, assembly, field inspection and testing tasks are defined separately. The proposal states which party is responsible for which work.

From which regions do you receive requests for exploration?

Requests from Çorlu, Ergene, Kapaklı and Tekirdağ are evaluated from our Çerkezköy center. The time and conditions of the field visit are decided separately.