hydrant placement
Intra-facility roads, fire truck approach, response distances and the external environment of the protected buildings are examined together. Hydrants are positioned in accordance with maintenance, traffic and access conditions.
Hydrant ring line, critical hydrant calculation, valve plan and water supply project for factories, industrial facilities and large campuses.
Within the scope of the study on the hydrant system, the connection diagram of the ring lines, important valve and hydrant points, pipe route, elevation and line length information and critical water demand calculation assumptions are reported together. Site access is also controlled.
Depending on the type of project, quantity surveying, technical specifications, test procedure and as-built drawings are also included in the scope of work.
EN/NFPA criteria regarding the fire risk of the facility, its intended use and the BYKHY to be applied are determined at the beginning of the design. No single fixed hydrant flow rate or pressure is correct for all facilities.
The current BYKHY, relevant product and system standards, manufacturer conformity certificates and authorized administration/fire department opinions are verified at the beginning of the design. Fixed flow/pressure/capacity values are not declared without project data.
Technical Project Request →In the Fire Hydrant Systems study, the following information can be shared at the first meeting. Field detection or additional calculation requirements for missing data are determined separately. Preparation of documents does not automatically guarantee acceptance by the relevant institution or a particular test result.
| Startup entry | Output to be defined in the proposal |
|---|---|
| Campus plan and outdoor access | Hydrant and isolation valve plan |
| Ring line, valve and elevation information | Critical point calculation and equipment list |
| Simultaneous demand scenario with water supply | Field test plan defined in the contract |
The campus plan and outdoor access are shared along with the facility's district, usage type and desired service. Account, project, application and test items are separated in the written scope.
When there is a new factory building, road change or intra-parcel line revision, the fire department approach, hydrant access and continuity of the ring line are re-evaluated. Matching of existing valve chambers with the project plan is checked.
Hydrant and isolation valve plan, critical point calculation, equipment list and other documents included in the scope of work are delivered. The file format and revision scope are determined at the outset.
No. Hydrant placement and hydraulic calculation depends on the location of the buildings to be protected, access roads, water source and relevant design conditions. Calculation results of another campus cannot be used verbatim.
Project planning, assembly, field inspection and testing tasks are defined separately. The proposal states which party is responsible for which work.
Requests from Çorlu, Ergene, Kapaklı and Tekirdağ are evaluated from our Çerkezköy center. The time and conditions of the field visit are decided separately.
Share the facility location, current project status and the service you want for Fire Hydrant Systems. Let's clarify the scope of discovery, calculation, application and delivery together.