Flow rate, pressure and duty point
Pump duty point, system curve and critical pressures are evaluated in design scenarios based on hydrant, sprinkler and fire cabinet requirements.
Our fire pump service considers the water demand of the system and the pump room layout together. MKA Engineering; Provides project and technical consultancy for duty point evaluation, pump/tank connections, equipment layout and test setup. This page is not an independent product price catalogue.
In the design of the fire pump room, the fire water requirement of the facility to be protected, storage arrangement, elevation differences, pipe routes and system losses are considered together. It is not enough for the pump capacity to appear appropriate on the catalogue; The task point needs to be compared with the system need and project criteria.
Pump duty point, system curve and critical pressures are evaluated in design scenarios based on hydrant, sprinkler and fire cabinet requirements.
Pump group components, control panels, appropriate equipment and backup order when necessary are determined according to the project conditions and the selected standard.
Water tank connection, valve and check valve placement, measurement and test connections, loss-producing elements and service access are designed.
The ventilation-exhaust requirements of pump bases, maintenance spaces, drainage, power supply and diesel equipment are coordinated under application conditions.
The same calculation-discipline approach is used in new installations and existing pump room improvements.
Fire scenarios, demand flow rate, critical pressure, water supply and available equipment information are collected.
Suction conditions, system losses, elevation differences and performance characteristics of the selected pumps are compared.
The pump group, collector and connections, control-measurement equipment, test line, maintenance and access arrangements are defined.
Project documents regarding specifications, quantity surveying, assembly controls and acceptance tests are prepared.
The project scope can be evaluated more accurately when existing data is shared.
Design criteria are determined by taking into account the specification and applicability of the project, especially BYKHY and relevant TS EN standards. Product approvals such as UL/FM are evaluated only by verifying the relevant product and certification scope.
Each pump room; The project should be designed separately according to the required flow rate, pressure, equipment certificates and field conditions.
Submit Technical Request →In the Fire Pump and Pump Room study, the following information can be shared at the first meeting. Field detection or additional calculation requirements for missing data are determined separately. Preparation of documents does not automatically guarantee acceptance by the relevant institution or a particular test result.
| Startup entry | Output to be defined in the proposal |
|---|---|
| Hydraulic system request and current account report | Pump duty point evaluation |
| Pump label, curve, tank and suction data | Suction-discharge and test setup diagram |
| Technical volume, reach and test line conditions | Equipment list and test/delivery records defined in the contract |
The hydraulic system request and current account report are shared along with the facility's district, usage type and requested service. Account, project, application and test items are separated in the written scope.
The drawings are compared with the field. If there are revisions, changes in use, and missing equipment information, their impact on the account or project is examined.
Pump duty point evaluation, suction-discharge and test layout diagram and other documents included in the scope of work are delivered. The file format and revision scope are determined at the outset.
No. Usage, system structure and field data are different. Numerical values cannot be applied to all facilities without verifying the relevant calculation and method.
Project planning, assembly, field inspection and testing tasks are defined separately. The proposal states which party is responsible for which work.
Requests from Çorlu, Ergene, Kapaklı and Tekirdağ are evaluated from our Çerkezköy center. The time and conditions of the field visit are decided separately.
Share the facility location, current project status and desired service for Fire Pump and Pump House. Let's clarify the scope of discovery, calculation, application and delivery together.