Hazard Class
The necessary information is examined to determine the design principles according to the use of the location and storage conditions.
Sprinkler hydraulic calculation service converts the water demand and critical circuit conditions of the defined design scenario into a calculation report. MKA Engineering carries out the calculations of new projects and control of existing projects according to its service scope. General system selection and scope of application are described on the separate sprinkler service page.
Hazard class, design area, application density and system geometry of the spaces to be protected are decisive in sprinkler calculation. The pump requirement is evaluated by taking into account pipe diameters, simultaneously operating sprinklers and critical circuit pressure losses.
The necessary information is examined to determine the design principles according to the use of the location and storage conditions.
Sprinkler placement, elevation differences, line lengths and local losses are transferred to the calculation model.
The flow-pressure point required by the system is compared with the existing or proposed pump characteristics.
Line diameters, installation layout and revision suggestions, if necessary, in accordance with the calculation results are included in the project.
The scope of work is determined by the size of the project and existing system data.
Purpose of use, storage method, locations and plans are examined.
The design area and line layout are determined.
Critical circuit, losses, level difference and pump point are checked.
Calculation printouts and application coordination notes are prepared.
For preliminary technical evaluation, the following data available may be shared:
According to the project conditions, the relevant design criteria within the scope of BYKHY and TS EN 12845 are evaluated; Situations requiring different references are determined separately.
Each project is evaluated separately according to its own structure and usage conditions.
Create Technical Request →The following information available in the Sprinkler Hydraulic Calculation study can be shared at the first meeting. Field detection or additional calculation requirements for missing data are determined separately. Preparation of documents does not automatically guarantee acceptance by the relevant institution or a particular test result.
| Startup entry | Output to be defined in the proposal |
|---|---|
| Design criteria, usage and storage data | Account acceptances and method used |
| Pipe route, elevations and equipment information | Critical circuit and node results |
| Water supply and pump operating data | Evaluation of project demand and pump/tank relationship |
Design criteria, usage and storage data are shared along with the facility's district, usage type and desired service. Account, project, application and test items are separated in the written scope.
The drawings are compared with the field. If there are revisions, changes in use, and missing equipment information, their impact on the account or project is examined.
Calculation acceptances and the method used, critical circuit and node results and other documents included in the scope of work are delivered. The file format and revision scope are determined at the outset.
No. Usage, system structure and field data are different. Numerical values cannot be applied to all facilities without verifying the relevant calculation and method.
Project planning, assembly, field inspection and testing tasks are defined separately. The proposal states which party is responsible for which work.
Requests from Çorlu, Ergene, Kapaklı and Tekirdağ are evaluated from our Çerkezköy center. The time and conditions of the field visit are decided separately.
Share the facility location, current project status and the service you want for the Sprinkler Hydraulic Account. Let's clarify the scope of discovery, calculation, application and delivery together.
The water demand determined in the hydraulic calculation depends on the pump selection. fire water tank and supply infrastructure also requires evaluation. Tank and pump components are considered together based on the facility's validated design inputs.