0506 024 37 22info@mkamuhendislik.com
MKA Engineering · Project and technical consultancy

Fire Installation Periodic Control

Periodic fire installation control is a service to evaluate the safe use conditions of the relevant equipment and installation in accordance with the applicable requirements. MKA Engineering first examines your request in terms of equipment type, current project and valid registration/authorization conditions. The explanations on this page are not a declaration of unlimited authority for all fire equipment. The official control scope and the registration/authorization conditions of the person who will prepare the report are verified before the work begins. Maintenance, monthly operational inspection and project compliance review are not confused with formal periodic control. Facilities in Çerkezköy, Çorlu, Ergene, Kapaklı and Tekirdağ can contact for scope and proposal evaluation.

quick reply

Periodic fire installation control is a service to evaluate the safe use conditions of the relevant equipment and installation in accordance with the applicable requirements. MKA Engineering first examines your request in terms of equipment type, current project and valid registration/authorization conditions.

Determine equipment and scope of authority before request

All parts offered by the business under the fire installation heading may not fall into the same control class or the same report. At the first meeting, the type of system, equipment list, usage of the facility and the expected report are learned. Valid registrations, professional authorization conditions and, if applicable, requirements at the organizational level are reviewed for the relevant equipment. Registration number alone does not serve as proof of authorization for all equipment groups. Works outside the scope are specified in the proposal. No definitive statement can be made about an authorization or certificate that cannot be verified; Official control is not undertaken until the necessary document and institution verification is completed.

Project, previous reports and operating records

The current fire project, equipment information, previous inspection reports, maintenance and test records help in preliminary evaluation. Finding documentation is not a substitute for a field investigation; Differences between the field and the project are also discussed. If the project is incomplete or out of date, this must be reported at the time of request. The impact of the deficiency on the control process and, if necessary, separate project service are evaluated. Preparation of a drawing does not imply automatic positive issuance of the control report. The controller's measurements, findings and evaluation must be traceable; The result is not promised in advance.

Inspection of sprinkler, pump, hydrant and cabinet installations

Depending on the system type, evaluation inputs may include valve locations, access, visible damage, equipment information, test patterns, and operating records. Which inspections and tests will be performed is determined by the relevant method and the applicable scope. It is not said that the same pressure or flow rate will be sought in all facilities. Water source and existing project information are important in preparing test conditions. The suitability of the measuring device and the required traceability records are checked. If there are different discipline and authority requirements in detection, electrical or special extinguishing systems, these are defined separately.

Difference from maintenance and monthly inspection

Maintenance; It may include operating activities such as service, adjustment, cleaning, repair and parts replacement. Monthly technical audit supports the monitoring and corrective action follow-up of the business. The purpose and reporting conditions of periodic control subject to legislation are different from these. It cannot be claimed that a maintenance form or photographic inspection report is a substitute for official inspection in all cases. If the business does not know which service it wants, the expected output is explained in the first meeting. Activities are named separately in the proposal; It prevents the customer from purchasing the wrong service just by looking at the report title.

Safe preparation for inspection day

Access, working hours, areas that may be affected during testing, and the participation of personnel who will use the system are discussed in advance with the facility manager. Testing cannot be carried out without ensuring safe working conditions. The required water supply, discharge and drainage arrangements are planned according to the characteristics of the system. Operational effects that may occur during the test are evaluated by the relevant parties; There is no general guarantee of uninterrupted operation. If there are special facility security or privacy rules, they are shared prior to discovery. Unnecessary personal data such as identification documents and employee lists are not included in the request for quotation; System information is sufficient to determine the technical scope.

Report, findings and corrective action follow-up

The type, scope and responsible person of the delivery document are disclosed during the offer. The examinations and tests performed, the method used, the measurements and the findings detected are recorded in accordance with the relevant reporting conditions. Elimination of nonconformities may require separate maintenance or application work. It is also determined how a resolved finding will be confirmed and whether re-examination is required. The purpose of the engineering service is not to promise a positive report in advance, but to reveal the real situation in a clear and traceable way. The results are conveyed to the business manager in an understandable manner; The official report is distinguished from the supplementary technical advice.

Determination of control interval and bid

A single period valid for all systems for the control interval is not declared here. The relevant equipment group, applicable legislation, applicable standard, manufacturer information and conditions of use must be verified together. Current official sources are taken as basis; An old web table alone is not a source of decision. In price evaluation, the number of systems, facility layout, documentation status, tests to be performed and field conditions are taken into account. Sharing the company name, facility district, equipment list and expected report makes it easier to determine the scope. The exact scope of service and applicable authorization conditions are clarified in the written offer.

Frequently asked questions

How often is the check done?

The duration is verified based on the relevant equipment group and current requirements. This page does not declare a single control interval for all fire systems.

Does EKIPNET registration mean authorization for all equipment?

No. Equipment type, profession and other applicable conditions must be evaluated together. Registration and authorization scope are verified prior to work.

Is the maintenance report sufficient?

Maintenance and periodic inspection subject to legislation are separate activities. The purpose of the requested document and the relevant report conditions should be checked.

If I don't have a project, is it checked?

Report the lack of a project from the beginning. The impact of this on the scope of control and the project work that may be required are evaluated separately according to the relevant requirements.

Is a positive report guaranteed?

No. The report is based on actual inspection and testing findings. The result is not guaranteed before the service begins.

What should I send for a quote?

State the facility's district, fire system type, equipment information and project/previous reports, if any. Do not share unnecessary personal or confidential production data.

Discovery and technical proposal request

Share the facility location, current project status and the service you want for Fire Installation Periodic Control. Let's clarify the scope of discovery, calculation, application and delivery together.

Region and official information sources

These links are sources of information; It is not a claim of agreement or official business partnership with institutions.