01 / PUMPFire pumps and control panels
Automatic/manual operation readiness, alarm conditions, panel warnings, pressure switches, leakage, vibration, leakage and maintenance access are checked in electric, diesel and jockey pump groups. Functional tests are planned under safe conditions within the framework of the manufacturer's instructions and facility procedure.
02 / WATER SOURCEFire water tank and reserve
Usable water reserve reserved for fire, level indicators, filling order, low level warnings, suction connections, valve positions and continuity of water supply are examined. Physical problems, contamination and access restrictions in the warehouse are recorded.
03 / SPRINKLERSprinkler heads and lines
Visible damage to sprinkler heads, paint, corrosion, improper blocking and improper storage distances; Label, position, leakage and indicator status are evaluated at alarm/control valve stations. Additional requirements of dry and pre-action systems are discussed separately.
04 / CABINETFire cabinets and hoses
Accessibility of fire cabinets, cover and lock status, hose/reel, nozzle, valve, connections, operating instructions and visible damages are checked. Pressure, flow and hose tests are carried out in the relevant procedure and appropriate test periods.
05 / HYDRANTHydrants and outfield ring line
Hydrant access, covers, connection ports, marking, mechanical damage, sealing and environmental barriers are examined. Determinations regarding ring valve positions and necessary test points are recorded.
06 / VALVESControl valves, alarm valves and check valves
Main shut-off valves and monitored valves are checked for correct position and accessibility, label and seal status, visible leakage and corrosion. Equipment that must normally be kept open or closed is verified according to the approved project and operating procedure.
07 / PRESSUREManometers and hydraulic gauges
The readability and value trends of the indicators on the pump suction-discharge, floor and system lines are examined. Measurements are compared with the approved project, the design criteria of the system and previous records; A single constant pressure value is not assumed for all buildings.
08 / PIPINGPipelines, hangers and mechanical integrity
Leaks in exposed pipes, corrosion, loose hangers, impact damage, improper intervention, risk of freezing and access to control points are evaluated. Hidden installation sections are handled separately according to access and testing possibilities.
09 / ALARMStream switches and tracking links
Alarm and fault conditions are examined for pressure/flow switches, valve status monitoring elements, alarm panel and building management system connections in the system. Signal transmission and function tests are coordinated with the relevant operating authorities.
10 / BUSINESSRecords, access and user preparation
The pump room layout, markings, test and maintenance forms, fault history, closure of previous nonconformities and emergency operating instructions available to the responsible personnel are checked. The impact of changing usage and storage conditions on the existing system is evaluated.