Scope of control in mechanical installations and equipment

Formal periodic inspection requests are evaluated based on equipment type and applicable requirements. The valid registration/authorization conditions and required contractual procedures of the person who will prepare the report are verified before the work begins. Supplementary technical inspection, maintenance follow-up and legal control are defined by separate scope and documentation.

Scope Assessment Based on EquipmentRegulatory ControlEquipment Based InspectionTechnical ReportingCorrective Action Tracking
Periodic control service

We distinguish between legal work equipment inspection and operational maintenance.

Periodic control of work equipment; It is the inspection of the safe use conditions of devices and systems covered by the relevant legislation by authorized persons within the specified period and criteria. Periodic maintenance includes service, cleaning, lubrication, adjustment, parts replacement and repair. Both activities complement each other, but do not replace each other.

Formal periodic inspection requests are evaluated based on equipment type and applicable requirements. The valid registration/authorization conditions and required contractual procedures of the person who will prepare the report are verified before the work begins. Supplementary technical inspection, maintenance follow-up and legal control are defined by separate scope and documentation.

01 / AUTHORIZED ENGINEER

EKIPNET registered expertise

Formal periodic inspection requests are evaluated based on equipment type and applicable requirements. The valid registration/authorization conditions and required contractual procedures of the person who will prepare the report are verified before the work begins. Supplementary technical inspection, maintenance follow-up and legal control are defined by separate scope and documentation.

02 / OFFICIAL REPORT

Legislation and OHS-CLERK

Formal periodic inspection requests are evaluated based on equipment type and applicable requirements. The valid registration/authorization conditions and required contractual procedures of the person who will prepare the report are verified before the work begins. Supplementary technical inspection, maintenance follow-up and legal control are defined by separate scope and documentation.

03 / HOLISTIC AUDIT

System, equipment and operation

In addition to equipment that must be legally controlled, the technical condition of pumps, valves, piping, automation interfaces and auxiliary installations can also be examined; These studies are defined by separate scope and report.

Technical and legal scope note

Not every mechanical installation element automatically falls within the scope of mandatory legal periodic control. Official control is carried out according to the scope of Annex III, engineering branch authority and, if any, special inspection organization or other authorization conditions. Other system reviews are carried out separately as project suitability, operational safety, maintenance and performance evaluation. It is especially important to find projects for fire mechanical installations and ventilation/air conditioning controls and to evaluate project suitability.

01

Fire Extinguishing and Smoke Control Installations

Fire water and special extinguishing systems; We evaluate it together with design criteria, safe operation, mechanical integrity and operating records.

Sprinklers and sprinkler systems

Sprinkler heads, ceiling and in-shelf protection, wet/dry/pre-action/deluge valve stations, alarm check valves, flow switches, manometers, test and drainage lines, pipe-hanging systems, corrosion, leakage and blocked spaces are examined.

Fire pump groups

Electric and diesel fire pumps, jockey pumps, pressure switches, suction-discharge collectors, check valves, mechanical interface with control panels, test line, flowmeter, relief valves, fuel, cooling, vibration and automatic start records are evaluated.

Hydrant and ring networks

Underground/surface hydrants, ring lines, isolation and sector valves, fire department connections, access, marking, mechanical damage, sealing, pressure and flow performance, relevant test methods and records are included in the scope of control.

Fire cabinets and column lines

Fire cabinets, reels, hoses, nozzles, valves, cabinet labels, pressure reducers, dry-wet columns, fire brigade water supply connections, connection ports, access and test records are examined.

Fire water tank and supply

Usable fire water reserve, water level sensors, tank inlet and outlet, suction connections, automatic filling, overflow and drainage, isolation valves, continuity of usable water and sealing are evaluated.

Gas and foam special extinguishing

Gas cylinders, collector, pressure gauges, distribution pipes, nozzles, valves, foam tank, proportioner and dosing pumps, kitchen hood extinguishing mechanical parts and related commissioning/maintenance records are examined by system type.

Smoke evacuation and pressurization

Smoke exhaust fan, jet fan, pressurization fan, smoke duct, motor damper, damper blade, connections and hangers, air flow rate and pressure difference; It is evaluated in coordination with the relevant electrical/detection discipline within the scope of the fire scenario.

02

Ventilation, Air Conditioning and Indoor Air Quality

Design flow rates, equipment safety, hygiene, energy and system performance are examined for normal operating HVAC installations.

Air handling units and fresh air units

The power plant body, filters, differential pressure, fan, motor, belt-coupling, bearing, vibration wedges, heating/cooling coil, mixture damper, heat recovery unit, condensate pan, siphon and automation sensors are checked.

Fans, extractors and air ducts

Axial/radial/duct/roof fans, duct hangers, flexible connections, silencers, air leaks, vents, diffusers, balance dampers, VAV/CAV boxes, flow rate, vibration, contamination and maintenance access are evaluated.

VRF/VRV, split and packaged air conditioning

Indoor/outdoor units, condenser-evaporator, fan, compressor, refrigerant pipes, valves, drainage, thermal insulation, temperature and pressure indicators, fault codes, service-maintenance and leak monitoring records are examined.

Industrial ventilation and dust collection

Precautionary records for welding fumes and process suctions, local hoods, cyclones, filters, bagged/cartrige dust collection, silo ventilation, fan and duct lines, filter differential pressure, flow rate, static electricity and process risks are reviewed.

Private space ventilation

Pressure level, air direction, filtration, temperature/humidity, air exchange, measurement and hygiene monitoring records are examined according to project and facility type in laboratory, health, clean room, food and production areas. Required validations are a separate scope.

03

Heating, Cooling and Hydronic Systems

Water circulation, pressure, temperature, mechanical safety and operating capacity from heat generation to terminal devices are reviewed.

Boilers, burners and heating center

Hot water/superheated water/steam boiler, burner, limit thermostat, safety valve, manometer, feed water, chimney, valves, expansion equipment, temperature and pressure safety are examined. Authorized inspection and relevant testing requirements also apply to devices classified as pressure equipment.

Chillers and heat pumps

Compressor, evaporator, condenser, water and refrigerant circuits, circulation and flow switch, pressure-temperature measurement, leakage, water quality, vibration, cooling capacity and manufacturer service records are evaluated.

Cooling towers and evaporative devices

Management records of fan, motor, filler, drip arrester, nozzles, pool and float, circulation lines, blowdown, water conditioning, corrosion, contamination and microbiological risks are examined.

Circulation pumps and collectors

Pump motor, mechanical seal, coupling, vibration, bearing, collector, suction/discharge valves, check valve, strainer, filter, differential pressure, flow rate and hydraulic balance elements are checked.

Expansion tank, heat exchanger and safety

Membrane expansion tank, preliminary gas pressure, pressure sensor, safety valve, air separator, sediment trap, plate/tube heat exchanger, three-way motorized valve and thermal insulation are checked; If there is a pressure vessel liability, it is classified accordingly.

Radiator, fan-coil and floor heating

Terminal batteries, thermostatic and balancing valves, fan-coil fan, condensation pan, radiator connections, underfloor heating collectors, zone actuators, leakage, air vent and system flow rates are evaluated.

Cold rooms and commercial refrigeration

Cold room evaporator/condenser, compressor, control valves, defrost, refrigerant circuit, safety elements, insulation, door sealing and alarm/maintenance records are examined.

04

Plumbing, Water Storage and Pump Systems

Hygiene, business continuity, pressure, leakage and mechanical equipment safety are addressed in domestic water and drainage infrastructure.

Clean water and domestic hot water

Building entrance line, meter, filter, column, valves and check valves, pressure reducer, boiler, hot water circulation pump, thermostatic mixing valve, safety device, connections, corrosion and leakage are examined.

Hydrophore and pressurization

Multi-pump booster, water pressure sensors, mechanical interface of the control panel, pressure tank, suction-discharge collector, dry running protection, valve, check valve, vibration and performance records are evaluated.

Water tanks and level automation

Domestic water tanks, filling and overflow, level control, automatic valves, drainage, ventilation, cleaning access, water quality maintenance records, suction connections, casing/sealing and labeling are covered.

Wastewater, rainwater and pumping

Waste water/rain water columns, vents, strainers, manholes, waste water lift pumps, floats, check valves, oil traps, backflow protection, clogging and leaks are checked.

Water purification and recovery

Softening, reverse osmosis, filters, dosing pumps, UV unit, gray water and rainwater treatment/reuse lines, backflow preventers, sensors and maintenance records are examined according to the technical specifications.

05

Pressure Vessels and Industrial Mechanical Installations

The scope and authority limits of high-risk auxiliary systems such as compressor, compressed air, steam, condensate, process water and fuel are evaluated separately.

Compressor and air tanks

Screw/piston compressor, air tank, air dryer, oil-water separator, filter, automatic condensate discharge, safety valve, manometer, pressure switch, ring and branch air lines, sealing and leakage tendencies are examined.

Steam and condensate installations

Steam boiler, feed tank, separator, pressure reducing station, safety valve, steam trap, condensate pump, condensate collection and flash tanks, expansion elements, pipe supports and high temperature insulation are checked.

Pressure vessels and tanks

Equipment such as boiler, autoclave, pressure tank, expansion and booster tank, steam generator, air/nitrogen tank; Depending on the type, it is included within the scope of authorized control in terms of manufacturer data, labeling, safety, corrosion, measurement, testing and NDT requirements.

Process water and auxiliary lines

Process cooling water, circulation, pumps, heat exchanger, by-pass, filter, process tank, flowmeter, valve, hydraulic separator, pipe diameter and pressure losses are examined.

Natural gas, LPG and fuel installations

Gas fuel supply, regulator, filter, shut-off valves, connections, signs of leakage, mechanical interaction with chimney and exhaust are evaluated. Gas installation tests/distribution company approvals and special certification requirements also apply.

Industrial kitchen and hood

The mechanical connections of the hood, oil filter, duct cleaning and access, aspirator, fresh air balance, oil accumulation, fire damper and special extinguishing system are examined.

06

Mechanical Automation, Measurement and Auxiliary Equipment

Measuring devices, control elements, connections, insulation and operating documents that ensure traceability of all installation groups are discussed.

Valves, check valves and safety fittings

Ball, butterfly, slide, balancing, pressure reducing, safety and three-way valves, strainer, air vent, backflow prevention and filter groups are evaluated in terms of position, sealing and function.

Measuring devices and calibration

Manometer, thermometer, temperature/pressure sensors, differential pressure, flowmeter, energy meter, level sensors and field indicators; It is examined for readability, measurement traceability and required calibration record.

Mechanical automation and BMS

Motorized valve, damper actuator, pump sequencing, alarm, locking, freeze protection, pressure/level control, mechanical scenario and monitoring points are checked. Electrical and fire detection tests are carried out together with the relevant authorized branch.

Pipes, hangers, insulation and connections

Steel, stainless and plastic pipes; Fixed/sliding support, vibration isolation, expansion compensator, flexible connections, thermal insulation, vapor barrier, corrosion, condensation, leakage and drainage details are checked.

Project, label, maintenance and operating records

As-built, P&ID, equipment inventory, manufacturer's manual, project flow/pressure values, test-maintenance schedules, previous periodic control reports, corrective action closing records and responsible personnel information are examined.

Control process and reporting

From discovery to measurement, from reporting to risk monitoring.

Periodic inspection is not just a checklist. Equipment on site is compared with the current project; The impact of each finding on safe operation and the control measures to be applied are explained. Safe planning of tests, maintenance/production coordination, documentation and traceability of results are essential.

01 / PHASE

Inventory and project review

Equipment list, projects, P&ID, intended use, manufacturer's instructions, design pressure/flow rate and previous reports are received.

02 / PHASE

Field inspection and measurements

Control methods are determined by the type of equipment. The test device, pressure, flow, temperature, function and occupational safety conditions are verified.

03 / PHASE

Technical and legal report

Periodic control report in accordance with the legislation by the authorized person for those within the scope of ANNEX-III; A separate technical review report is prepared for other studies.

04 / PHASE

Defect and improvement tracking

Major/light defect classification is made according to the relevant report rules. Corrective action, safe operating conditions and rechecking if necessary are planned.

Documents required to prepare for the control

Approved installation projects, as-built/P&ID, if any, equipment inventory and identification/serial numbers, operating and pressure-flow design values, manufacturer documents, last periodic control reports, maintenance records, calibration documents, defect closure reports, test safety procedures should be prepared. An appropriate OHS-KATIP contract is also established for the equipment covered by legal control.

  • Measurement and control records
  • EKIPNET registered authorized person report
  • Defect/non-conformity list
  • Field determinations with photographs
  • Project suitability analysis
  • Corrective action suggestions
  • Contribution to the operation maintenance plan
Frequently asked questions

About authority, period and reporting.

We explain under what conditions the EKIPNET registered authorized engineering service creates an official report and how it differs from maintenance work.

Are periodic inspection and periodic maintenance the same?

No. Periodic control is the inspection and testing of work equipment covered by the relevant legislation by an authorized person. Maintenance includes operations such as cleaning, adjustment, lubrication, parts replacement and repair. Both are planned separately.

Is there an annual legal inspection requirement for all installations?

Formal periodic inspection requests are evaluated based on equipment type and applicable requirements. The valid registration/authorization conditions and required contractual procedures of the person who will prepare the report are verified before the work begins. Supplementary technical inspection, maintenance follow-up and legal control are defined by separate scope and documentation.

Is there an EKIPNET registered authorized engineer at MKA Engineering?

Formal periodic inspection requests are evaluated based on equipment type and applicable requirements. The valid registration/authorization conditions and required contractual procedures of the person who will prepare the report are verified before the work begins. Supplementary technical inspection, maintenance follow-up and legal control are defined by separate scope and documentation.

Is EKİPNET and İSG-KATIP contract necessary?

Formal periodic inspection requests are evaluated based on equipment type and applicable requirements. The valid registration/authorization conditions and required contractual procedures of the person who will prepare the report are verified before the work begins. Supplementary technical inspection, maintenance follow-up and legal control are defined by separate scope and documentation.

Is there a project required in fire installation?

During the periodic control of the fire mechanical installation, the project is examined for compliance with the Regulation on Fire Protection of Buildings and relevant technical standards. If there is no project, the employer has the obligation to design a project in accordance with the legislation.

Is a project required for ventilation and air conditioning installation?

The current ANNEX-III regulation regulates the availability of projects in ventilation and air conditioning installation controls and the evaluation of compliance with the project and scientific/technical conditions.

What tests are performed on pressure vessels?

Depending on the equipment class and applicable standard, document review, visual inspection, safety element inspection, appropriate pressure testing or non-destructive testing may be required. Test method, duration and criteria are determined by the authorized person according to the equipment.

What documents are given at the end of the control?

Depending on the job, a periodic control report or separate technical inspection report is prepared in accordance with the legislation. Device/installation description, control criteria, measurements, determinations, defect class, result, report date and authorized engineer information are included in accordance with the relevant legal requirements.

What documents should be prepared before the control?

Approved mechanical installation projects, application/as-built and P&ID drawings, equipment list, technical labels and serial numbers, manufacturer's instructions, previous inspection and maintenance reports, test and calibration records should be prepared.

Technical resources

Legislative and equipment-specific control.

Controls are carried out on the basis of the current regulation, valid editions of the relevant standards, approved projects and manufacturer's instructions. It is taken into account that the criteria may vary depending on the device, installation and equipment group.

Formal periodic inspection requests are evaluated based on equipment type and applicable requirements. The valid registration/authorization conditions and required contractual procedures of the person who will prepare the report are verified before the work begins. Supplementary technical inspection, maintenance follow-up and legal control are defined by separate scope and documentation.

MKA fire installation standard guide →

Fire installation monthly inspection and maintenance follow-up →

Let's create a control plan for your existing installations together.

Let us determine the legislation scope, period, inspection method and report requirement for your fire installation, HVAC, pressure vessel and other mechanical equipment. Contact us for your field requests in Çerkezköy, Çorlu, Ergene, Kapaklı and Tekirdağ.

Request Periodic Check →

Separate mechanical equipment inspection from fire control

The control request for fire installation is explained on a separate page. This page focuses on the scope assessment of ventilation, heating, cooling, water and industrial equipment. It is not claimed that every listed device is automatically covered by legal periodic control or that MKA has unlimited authority over all equipment.

Discovery and technical proposal request

Share facility location, current project status and desired service for mechanical equipment control. Let's clarify the scope of discovery, calculation, application and delivery together.