Mechanical Installation · Steam & Condensate · Çerkezköy and Çorlu

Industrial Steam and Condensate Return Line Project Design

We prepare mechanical projects and application details of steam distribution, pressure reducing stations, separators, steam traps and condensate return lines in production facilities.

Technical Calculation and Project

Design principles for Steam and Condensate Installations

In steam installation, it is not just the pipe diameter; Process load, steam pressure and degree of dryness, temperature, line slope, expansion and condensate management must be solved together.

01 / STEAM & CONDENSATE

steam consumption

Line capacity is determined based on the kg/hour requirement, working pressure and simultaneity of the process devices.

02 / STEAM & CONDENSATE

Line size and pressure loss

Steam velocity, pressure loss and temperature-appropriate piping are evaluated; The slope and drainage of distribution lines are designed.

03 / STEAM & CONDENSATE

Steam trap and separator

Condensate accumulation, air discharge and appropriate steam trap type are selected according to the point of use.

04 / STEAM & CONDENSATE

condensate return

The pressure at the steam trap outlet, flash steam generation and condensate pumping conditions are taken into account in the calculation.

Engineering Process

Discovery, calculation, project and field control

Design assumptions are clarified by evaluating each facility's intended use, existing infrastructure and equipment conditions separately.

01

Process needs analysis

Steam loads, operating pressures and rotation scenario are extracted.

02

Thermodynamic evaluation

Steam lines, temperature/expansion and possible condensate regimes are examined.

03

Equipment and layout

Pressure reducer, steam trap, discharge, valve and insulation details are determined.

04

Technical drawing and testing

Line diagram, support/compensation, quantity surveying and necessary tests are described.

Project Preliminary Information

The data we need in technical evaluation

  • Process steam consumption and pressures
  • Boiler/steam feed station capacity
  • Line routes and height differences
  • Current status of condensate recovery system
  • Operating temperatures and material/insulation conditions

Missing information and scope of discovery can be determined at the first meeting.

Safety and Standards

Critical conditions of the project

Water hammer and thermal expansion are serious risks in steam lines. It is not appropriate to connect the steam trap outlet to the high-pressure return line or ignore temperature compliance; details should be evaluated against authorized equipment documentation.

Relevant legislation, applicable TS/TS EN standards, employer technical specifications and manufacturer instructions are checked according to the project type. Application and testing processes must be carried out in accordance with the authorization/license conditions.

Submit Technical Request →
Technical Question

Is the diameter of the condensate line chosen the same as the steam line?

No. Condensate flow rate, back pressure, flash steam generation and transport regime are different; Separate account required.

Detailed Technical Coverage

Steam, Condensate and Recovery Subsystems

Each subsystem is evaluated with separate calculation and equipment criteria in the project; are combined into a single engineering solution suitable for operating conditions.

01 / SUBSYSTEM

steam consumption

The kg/hour loads, simultaneity and pressure-temperature operating conditions of the production machines are calculated.

02 / SUBSYSTEM

steam distribution pipes

Pipe diameters, velocity, friction loss, drainage slope, fixed-sliding support and thermal expansion are planned.

03 / SUBSYSTEM

pressure reducing station

Pressure reducing valve, separator, strainer, safety valve, manometer and bypass connections are described.

04 / SUBSYSTEM

steam trap station

The selection of float, thermodynamic or thermostatic steam trap is made according to the discharge conditions and condensate load of the process.

05 / SUBSYSTEM

condensate return line

Return pressure, flash steam formation, condensate collection tank, gravity or pumped return are calculated.

06 / SUBSYSTEM

Compensation and isolation

High temperature surfaces, thermal expansion, pipe hangers, insulation and personnel contact protection are evaluated.

07 / SUBSYSTEM

Safety and operational testing

Water hammer risk, condensate drainage, valve station function and temperature measurements are included in the acceptance document.

Equipment, accounts and documents

Steam-condensate P&ID, process flow table, valves, steam trap, separator, condensate tank, support and insulation details.

Technical inspection and delivery

Survey, calculation, application project, device selection, survey-quantity survey, technical specification, field control and related testing-commissioning processes are documented according to the project scope.