Mechanical Installation Isolation, Testing and Commissioning

We provide technical evaluation and field coordination for material-thickness selection in heat and condensation insulation, pressure and leakage tests in mechanical installation lines, flushing, balancing and commissioning controls.

Technical Calculation and Project

Design principles for Installation Isolation and Commissioning

Just because the installation has been chosen with calculations does not mean that it will provide the same performance in the operation. Assembly quality, insulation integrity, cleanliness, hydraulic adjustment and measured performance must be verified together.

01 / ISOLATION AND TEST

Heat and condensation insulation

Heat loss-gain, surface temperature, condensation risk and vapor barrier continuity of hot/cold lines are evaluated.

02 / ISOLATION AND TEST

Pressure and tightness test

The pipe material, design pressure and test method and recording criteria in accordance with relevant standards are described.

03 / ISOLATION AND TEST

Flushing and cleaning

Procedures for washing mechanical lines, filter/strainer cleaning and equipment protection are arranged.

04 / ISOLATION AND TEST

Balancing and commissioning

Reaching design values is checked through pump, valve, fan and terminal measurements.

Engineering Process

Discovery, calculation, project and field control

Design assumptions are clarified by evaluating each facility's intended use, existing infrastructure and equipment conditions separately.

01

Assembly control

Line route, insulation, test points and device connections are reviewed.

02

Test procedure

Safety precautions, test pressure and duration criteria appropriate to the relevant system are determined.

03

Cleaning and adjustment

Washing, ventilation, filtration, balancing and automation controls are planned.

04

Performance report

Measured flow rate, pressure, temperature and setting values are reported.

Project Preliminary Information

The data we need in technical evaluation

  • Application project and technical specification
  • Pipe/duct material, insulation type and thickness
  • Device and valve technical data sheets
  • Planned testing and acceptance procedure
  • Current measurement results and missing work list

Missing information and scope of discovery can be determined at the first meeting.

Safety and Standards

Critical conditions of the project

The test pressure and method should not exceed the allowable value of the weakest equipment. For steam and other special systems, only relevant legislation and authorized test procedures apply; Testing with water is not suitable for every system.

Relevant legislation, applicable TS/TS EN standards, employer technical specifications and manufacturer instructions are checked according to the project type. Application and testing processes must be carried out in accordance with the authorization/license conditions.

Submit Technical Request →
Technical Question

Is there a need for testing when the pipe is insulated?

No. Insulation is not a substitute for tightness testing; Whenever possible, testing and approvals are completed without closing the insulation.

Detailed Technical Coverage

Insulation, Leak-Tightness Tests and Commissioning Subsystems

Each subsystem is evaluated with separate calculation and equipment criteria in the project; are combined into a single engineering solution suitable for operating conditions.

01 / SUBSYSTEM

Hot pipe insulation

Heat loss, operating temperature, material thickness and personnel contact safety are calculated.

02 / SUBSYSTEM

Cold pipe condensation insulation

Inner and outer surface temperature, ambient humidity, vapor barrier integrity and hanging points are examined.

03 / SUBSYSTEM

air duct insulation

Duct heat loss, outdoor cladding, fire response conditions and flange/hanger details are checked.

04 / SUBSYSTEM

Pressure and tightness test

The test method, pressure and duration procedure appropriate to the system material, equipment limit and relevant standard are determined.

05 / SUBSYSTEM

Flushing and pipe cleaning

Washing, filter cleaning, bypass, air discharge, water quality and protection of circuit devices are provided.

06 / SUBSYSTEM

Hydraulic balance and fan flow measurement

Pump, valve, terminal, fan and duct flow rates are compared with design values.

07 / SUBSYSTEM

Control and delivery scenario

Automation functions, alarm, safety locks, as-built drawings, test forms and user training are completed.

Equipment, accounts and documents

Insulation recipes, bill of quantities, test pump, measuring devices, balance chart, flushing report and field acceptance minutes.

Technical inspection and delivery

Survey, calculation, application project, device selection, survey-quantity survey, technical specification, field control and related testing-commissioning processes are documented according to the project scope.